After-sales Service: | Online Service |
---|---|
Application: | Office Building |
Fast Installation: | Fast Installation |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Easy to Assemble Detachable Container House
|
||||
Size:
|
5950*3000*2800 mm
|
|||
Main Frame
|
0.23 mm Spray Painted Galvanization Steel Tube
|
|||
Purline:
|
Galvanization Steel Tube
|
|||
Wall Partition:
|
50 mm rock wool with 0.33 mm color steel plate
|
|||
Door:
|
0.4 mm Steel Door
|
|||
Window:
|
Window + Grating + Window screen
|
|||
Roof:
|
0.42 mm Color Steel Plate
|
|||
Ceiling:
|
0.24 mm Color Steel Plate
|
|||
Floor:
|
15 mm MGO Board or Cement Board, can add PVC Floor
|
|||
Cusomize:
|
According to Drawing
|
Our detachable container houses offer unparalleled ease of installation, empowering you to construct multiple buildings by effortlessly stacking and interlinking units. Tailor your living or working space with customizable accessories to suit your unique needs. Embrace the convenience and versatility with our groundbreaking housing solutions.
Q1: Are you a manufacturing factory or a trading company?
A: We are Suzhou Anshiju Integrated Housing Technology Co., Ltd., a premier manufacturing facility located in the heart of Zhenze Town, Wujiang County, Suzhou City, Jiangsu Province.
Q: What is needed to build a prefab house?
A: Simply provide us with your requirements, including the area, intended use, and number of stories. Although a sketch drawing is beneficial, it is not mandatory.
Q: How can I ensure the cost of building a prefab house?
A: After approval of the design, we will select the building materials and furnish you with a comprehensive quotation.
Q: How long does it take to build a light steel prefab house?
A: Typically, two skilled workers can assemble a room in approximately 3 hours, depending on the size.
Q: Is it difficult to build a prefab house?
A: No, assembling the house is straightforward if you follow the construction drawings and are proficient with electric tools.
Q: Can prefab houses be used in various buildings?
A: Indeed, they are highly versatile and suitable for hotels, offices, educational institutions, entertainment venues, light industrial workshops, and more.
Q: Are prefab houses stable?
A: Absolutely, they are engineered to withstand extreme conditions, including hurricanes and earthquakes, ensuring utmost safety.
Q: What are the advantages of prefab houses over traditional buildings?
A: Prefab houses offer superior isolation, fireproofing, anti-seismic properties, wind resistance, time and labor efficiency, increased usable area, and excellent termite-proof capabilities.
Q: What is the delivery time?
A: The delivery time varies based on order quantities, generally ranging from 5-15 days post-deposit receipt.
Suppliers with verified business licenses