Material: | Sandwich Panel |
---|---|
Colour: | White |
Folded Size: | 5800*2438*580mm |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Z-type folding container house | |
Size: | Exterior size: 5800*2438*2530 mm |
Inner size: 5780*2320*2230 mm | |
Folded size: 5800*2438*580mm | |
Main Frame: | Top frame: main beam 2.3mm(T) |
Bottom frame:main beam 2.3mm(T) | |
Wall partition: | 50mm/75MM Color Steel EPS/Rock wool Sandwich Panel,steel plate thickness 0.25mm |
Door: | Steel Door, size 970*1970mm |
Window: | Single glass, horizontally pushed and pulled |
Roof: | 0.4mm Color steel single tile |
Ceiling: | 0.3mm(T) color steel plate, 831 type |
Floor: | Cement fiber board,18mm(T), 1.8mm thick pvc floor |
Our highly skilled and experienced team at Suzhou Anshiju Integrated Housing Technology Co., Ltd. can construct 1000 sets of our innovative product within just 30 days. This product is designed to be easily folded for convenient loading and installation. If you encounter any difficulties during installation, we provide video tutorials for assistance.
We are a professional company based in Zhenze Town, Wujiang District, Suzhou City, Jiangsu Province, China. Our expertise lies in designing, manufacturing, construction, and after-sales service for integrated housing solutions.
Q1: Are you a manufacturing factory or a trading company?
A: We are Suzhou Anshiju Integrated Housing Technology Co., Ltd., a manufacturing factory located in Zhenze Town, Wujiang County, Suzhou City, Jiangsu Province. You are welcome to visit us at any time.
Q2: What do I need to provide to build a prefab house?
A: Simply provide us with a sketch drawing or your requirements such as the area, usage, and stories of the house, and we will create an amazing design for you.
Q3: How can I ensure the cost of building a prefab house?
A: Once the designing scheme is accepted and the building materials are confirmed, we will send you a detailed quotation based on your choices.
Q4: How long does it take to build a folding container house?
A: With 4 workers, 1 crane, and 15 minutes, you can have a complete house.
Q5: Is it difficult to build a prefab house?
A: Not at all, you can easily construct the house independently following the construction drawings.
Q6: Can prefab houses be used in buildings other than residential ones?
A: Yes, prefab houses can be utilized in various buildings like hotels, offices, schools, and more.
Q7: Are prefab houses stable?
A: Rest assured, our light steel prefab houses are designed to withstand hurricanes and earthquakes.
Q8: What are the advantages of prefab houses compared to traditional buildings?
A: Prefab houses offer better sound and heat isolation, fireproofing, anti-seismic properties, wind resistance, time and labor savings, more usable area, and excellent termite-proof capabilities.
Q9: What is the delivery time?
A: Delivery time typically ranges from 5 to 15 days after receiving the deposit, depending on order quantities.
Suppliers with verified business licenses