Customization: | Available |
---|---|
After-sales Service: | Online Service |
Material: | Steel Structure |
Still deciding? Get samples of US$ 1988/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
|
Q1: Are you a manufacturing factory or a trading company?
A: We are a manufacturing factory, Suzhou Anshiju Integrated Housing Technology Co., Ltd., located in Zhenze Town, Wujiang County, Suzhou City, Jiangsu Province.
Q: What do I need to provide to build a prefab house?
A: Simply provide us with a sketch drawing or your requirements such as area, usage, and number of stories for an amazing design.
Q: How can I ensure the cost of building a prefab house?
A: Accept the design scheme, confirm building materials, and receive a detailed quotation from us.
Q: How long does it take to build a folding prefab house?
A: Generally, 2 workers can build a room in about 15 minutes with a crane.
Q: Is it difficult to build a prefab house?
A: Not at all, you can build it independently following construction drawings.
Q: Can prefab houses be used in non-residential buildings?
A: Yes, they can be used in hotels, offices, schools, entertainment clubs, and light industrial workshops.
Q: Are prefab houses stable?
A: Absolutely, they are safe even in extreme weather conditions like hurricanes and earthquakes.
Q: What are the advantages of prefab houses compared to traditional buildings?
A: Better sound and heat isolation, fireproof and anti-seismic properties, wind resistance, time and labor-saving, more usable area, and excellent termite-proof capability.
Q: What is the delivery time?
A: Delivery time depends on order quantities, generally 5-15 days after receiving the deposit.