Customization: | Available |
---|---|
After-sales Service: | Online Service |
Application: | Office Building |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Easy to Assemble Detachable Container House
|
||||
Size:
|
5950*3000*2800 mm
|
|||
Main Frame
|
0.23 mm Spray Painted Galvanization Steel Tube
|
|||
Purline:
|
Galvanization Steel Tube
|
|||
Wall Partition:
|
50 mm rock wool with 0.33 mm color steel plate
|
|||
Door:
|
0.4 mm Steel Door
|
|||
Window:
|
Window + Grating + Window screen
|
|||
Roof:
|
0.42 mm Color Steel Plate
|
|||
Ceiling:
|
0.24 mm Color Steel Plate
|
|||
Floor:
|
15 mm MGO Board or Cement Board, can add PVC Floor
|
|||
Cusomize:
|
According to Drawing
|
Our detachable container houses are masterfully designed for effortless installation, empowering you to effortlessly create versatile structures by skillfully stacking and interlinking units. Customize your environment with desired accessories and relish in the unmatched convenience and flexibility offered by our groundbreaking housing solutions.
Q1: Are you a manufacturing factory or a trading company?
A: We are Suzhou Anshiju Integrated Housing Technology Co., Ltd., a dedicated manufacturing factory situated in Zhenze Town, Wujiang County, Suzhou City, Jiangsu Province.
Q: What is needed to build a prefab house?
A: Simply provide us with your specifications, such as area, intended use, and number of floors. A sketch drawing can be helpful but is not mandatory.
Q: How can I ensure the cost of building a prefab house?
A: Once the design is finalized, we will confirm the building materials and present you with a comprehensive quotation.
Q: How long does it take to build a light steel prefab house?
A: Depending on the size, typically, 2 workers can assemble a room in approximately 3 hours.
Q: Is it difficult to build a prefab house?
A: No, you can construct it independently with the provided construction drawings, as long as you are proficient with electric tools.
Q: Can prefab houses be used in various types of buildings?
A: Absolutely, they are versatile enough for use in hotels, offices, schools, entertainment clubs, light industrial workshops, and more.
Q: Are prefab houses stable?
A: Yes, they are engineered to be safe even in extreme conditions such as hurricanes and earthquakes.
Q: What are the advantages of prefab houses over traditional buildings?
A: They offer superior isolation, unmatched fireproofing, excellent anti-seismic properties, robust wind resistance, time and labor efficiency, increased usable area, and outstanding termite-proof capabilities.
Q: What is the delivery time?
A: Delivery time varies based on order quantities, but typically ranges between 5-15 days after receiving the deposit.