Material: | Steel Structure |
---|---|
Install Time: | 15 Mins |
Loading Qty: | 12 Set |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Q1: Are you a manufacturing factory or a trading company?
A: We are a distinguished manufacturing factory located in Zhenze Town, Wujiang County, Suzhou City, Jiangsu Province. We warmly welcome you to visit us at any time.
Q2: What do I need to provide to build a prefab house?
A: Simply notify us of your specific requirements such as the area, intended usage, and number of stories. A sketch drawing is helpful but not mandatory.
Q3: How can I ensure the cost of building a prefab house?
A: Once the design scheme is approved, we will confirm the types and qualities of building materials, providing you with a detailed and transparent quotation.
Q4: How long does it take to build a folding prefab house?
A: Generally, a team of 2 workers can assemble a room in approximately 15 minutes with the aid of a crane.
Q5: Is it difficult to build a prefab house?
A: Not at all! You can easily build the house independently by following the construction drawings, provided you are adept at using electric tools.
Q6: Can prefab houses be used in buildings other than residential ones?
A: Absolutely! Prefab houses are versatile and can be utilized in various settings, including hotels, offices, schools, entertainment clubs, light industrial workshops, and more.
Q7: Are prefab houses stable?
A: Rest assured, our light steel prefab houses are engineered to be safe and stable, even in extreme conditions like hurricanes and earthquakes.
Q8: What are the advantages of prefab houses compared to traditional buildings?
A: Prefab houses offer numerous advantages over traditional buildings, including superior sound and heat insulation, fireproof and anti-seismic properties, wind resistance, time and labor savings, increased usable area, and excellent termite-proof capability.
Q9: What is the delivery time?
A: Delivery time varies based on order quantities, typically ranging from 5 to 15 days after receiving the deposit.
For more information, contact Suzhou Anshiju Integrated Housing Technology Co., Ltd.
Suppliers with verified business licenses